Click here to make tpub.com your Home Page

Page Title: Submission of designs for approval
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-H-48620(AR)
c. Applicable packaging data sheet number (see 5.1).
d. Selection of applicable levels of preservation,
packaging and packing.
e. Applicable stock number.
f. Requirements for First Article Submission,
including data requirements for certificates of
conformance for materials.
6.3 Inspection
equipment
design.
6.3.1 Government design. - Unless otherwise specified in the
contract, all inspection equipment specified by drawing number in
specifications of SQAP forming a part of the contract shall be
supplied by the contractor in accordance with technical data listed
in the Technical Data Package (TDP).
6.3.2 Contractor design. - The contractor shall design and supply
inspection equipment compatible with tile "Methods of Inspection"
specified in 4.6 of this specification and with the "Test Conditions"
specified  in  the  "General  Requirements"  of  MIL-STD-810.  Since
tolerance of test equipment is normally considered to be within 10%
of the product tolerance for which it is intended, this inherent
error in the test equipment design must be considered as part of the
prescribed  product  tolerance  limit.  Thus,  concept,  construction
materials and dimensions shall be so selected and controlled as to
insure that the test equipment will reliably indicate acceptability
of a product which does not exceed 90% of the prescribed tolerance
limit and permit positive rejection when non-conforming. Construct-
ion shall be such as to facilitate routine calibration of test
equipment.
6.3.3 Submission of designs for approval. - Contractor designs
shall be approved by the Government prior to fabricating or pro-
curing the- equipment. Partial submission of inspection equipment
designs is permissible and encouraged. However, the completion date
for design review will be based on the date of the final submission
of designs and the required delivery schedule aS stipulated in the
contract. Submit designs as required to: Commander, US Army
Armament Research and Development Command, ATTN: DRDAR-QAF-I,
Dover,  NJ  07801.
23

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business