Click here to make tpub.com your Home Page

Page Title: Requirements
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-I-60518A
(Unless otherwise indicated, copies of federal and military specifications and standards are available from
Standardization Documents Order Desk, Bldg. 4D, 700 Robbins Avenue, Philadelphia, PA 19111-5094.)
2.1.2 Other Government documents, drawings, and publications. The following Government
drawings form a part of this specification to the extent specified herein. Unless otherwise specified, the issues
are those cited in the solicitation (see 6.2).
DRAWINGS
NAVAL ORDNANCE STATION (CAGE Codes 19200 and 19203)
10520556
Initiator, Cartridge Actuated, M28 Metal Parts Assembly
8830992
Box, Fiberboard (Inner), Packing, Ammunition, For Initiator, Cartridge Actuated,
M28
8830993
Box, Packing, Ammunition, For Initiator, Cartridge Actuated, M28
9216932
Box, Fiberboard (Outer), Alternative, Packing Ammunition, for Initiator, Cartridge
Actuated, M28
U.S. Air Force
TPO 00-724-9886
Initiator, Cartridge Actuated, M28
(Application for copies should be addressed to: Commanding Officer, Naval Ordnance Station, Data Control
Branch (Code 3720), Indian Head, MD 20640-5035.)
2.2 Order of precedence. In the event of a conflict between the text of this document and the references
cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes
applicable laws and regulations unless a specific exemption has been obtained.
3. REQUIREMENTS
3.1 First article. When specified in the contract or purchase order (see 6.2), a sample shall be subjected
to the first article inspection (see 4.3 and 6.3).
3.2 Materials. All materials used in the manufacture of the initiators shall conform to the specifications
referred to on the respective drawings unless specific approval in writing covering a departure therefrom has
been obtained from the cognizant Navy design activity prior to manufacture. When alternate materials or
methods of manufacture are specified on the drawings, the bidder's selections shall be clearly stated in the
proposal.
3.2.1 Raw material. The contractor shall be responsible for selecting from the classification list
contained in the raw material specification the surface and physical condition of the raw material intended for
use in manufacture.
2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business