|
| ![]() MIL-I-70534 (AR)
4.5.4.3 Leakage test. The test shall be performed in
accordance with the procedure specified in para. 4.4.3.1 and 4.4.3.2
or 4.4.3.6 of MIL-P-116H. After the test, the seal shall be
examined for compliance with the requirements of 3.5.3.
(Non-Destructive Test.)
4.5.4.4 Heat seal of barrier bag. The test shall be performed
in accordance with the procedure specified in para. 4.4.4.3 of
MIL-P-116H. After the test, the seal shall be examined for
compliance with the applicable requirements (Destructive Test).
4.5.4.5 Jumble. The igniter assemblies shall be tested in
accordance with procedures specified in MIL-STD-331, Test 102,
except that the duration of the test shall be a minimum of 20
minutes. The assemblies and equipment shall be observed for
compliance with 3.5.4 (Destructive Test) .
4.5.6 Bridge wire resistance test. The igniter shall be tested
for the required bridge wire resistance with an approved ohmmeter in
accordance with para. 4.4.4. Observation shall be made for
(Non-Destructive Test)
compliance with applicable requirements.
PACKAGING
5.
5.1 Packaging.
5.1.1 Packaging shall be in accordance with drawing 9392395.
5.2 Packing.
5.2.1 Packaging shall be in accordance with drawing 9392394.
5.3 Marking.
5.3.1 Marking shall be in accordance with drawings 9392395 and
9392394.
NOTES
6.
6.1 Intended use. The components covered by this specification
are intended for use on the Igniter, Electric Match.
6.2 Ordering data.
See MIL-A-48078.
6.3 Submission of inspection equipment for design app rovals.
See MIL-A-48078. Submit designs as required to: Commander, US Army
Armament Research and Development Center, ATTN: AMSMC-QAT-I (D),
Dover, NJ 07801-5001.
21
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |