|
| ![]() MIL-I-85889(AS)
4.3.2 Tests.
4.3.2.1 Environmental verification testing. The contractor shall demonstrate the igniter design is capable
of wihtstanding representative life cycle stresses by subjection test items to the series of environments specified
in table VII or VIII, as applicable.
TABEL VII. Environmental verification test matrix for Type I igniters.
TABLE VIII. Environmental verifiecation test matrix for Type II igniters.
15
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |