|
| MIL-K-48196(MU)
(Copies of specifications, standardds, drawings, and publica-
tions required by suppliers in conection with specific
procurement functions should be obtained from the procuring
activity or as directed by the contracting officer.)
REQUIREMENTS
3.
3.1 Materials. The contractor shall furnish objective
evidence (see 6.2) that the material complies with the speci-
fications listed on the applicable drawing.
3.2 Assembly. The key shall comply with all requirements
specified on the drawing (dwg) 10522823, with all requirements
specified herein, and with the requirements of all applicable
specifications to the extent specified on the drawing and herein.
3.3 Workmanship.
3.3.1 Plastic and metal characteristics. All compo-
nents shall be free from cracks, splits, cold flow, shrinkage,
cold shuts, inclusions, porosity~ or any similar characteristics
3.3.2 Burrs. Parts shall be free from burrs.
3.3.3 Foreign matter. Parts shall be free from chips,
dirt, grease, rust, corrosion, or any embedded foreign ma-
terial.
3.3.4 Cleaning_. The cleaning method shall not be in-
jurious to any of the parts, nor shall the parts be contaminated
by the cleaning agent.
QUALITY ASSURANCE PROVISIONS
4.
4.1 Responsibility for inspection. Unless otherwise
specified in the contract or purchase order, the supplier
is responsible for the performance of all inspection re-
quirements as specified herein. Except as otherwise Speci-
fied in the contract or order, the supplier may use his own
or any other facilities suitable for the performance of the
inspection requirements specified herein, unless disapproved
by the Government. The Government reserves the right to
perform any of the inspections set forth in the specifica-
tion where such inspections are deemed necessary to assure
supplies and services conform to prescribed requirements.
4.2 First article inspection. Not applicable
4.3 Quality conformance inspection.
4.3.1 Lot formation.
2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |