|
| MIL-L-23822C(AS)
3.9 (Cont'd)
Government's notice of approval, shall be determinative of the re-
quirements of the contract relative to workmanship insofar as not
specifically covered by applicable specifications.
4
QUALITY
ASSURANCE
PROVISIONS
4.1
Responsibility for inspection. Unless otherwise speci-
fied in the contract or puchase order, the supplier is responsible for
the performance of all inspection requirements as specified herein.
Except as otherwise specified in the contract or order, the supplier
may use his own facilities or any commercial laboratory acceptable
to the Government. The Government reserves the right to perform
any of the inspections set forth in the specification where such inspec-
tions are deemed necessary to assure that supplies and services con-
form to the prescribed requirements.
4* 2
Classification of examinations and tests.
Examin-
ations and tests of the rocket engine shall be classified as follows:
a. Preproduction Test
4.4
b. Quality Conformance Test
4.5
c. Production Monitoring Test
4.3.3
d. Reliability Test
4.6
4.3
Sampling.
4.3.1
Preproduction sample.
The preproduction sample,
manufactured in accordance with 3.2, shall consist of not less than
15 rocket engines.
4.3.2
Quality conformance sample. One rocket engine
shall be randomly selected from each group of 21 production rocket
engines as the sample for the quality conformance test. The engine
selected shall not be considered as a deliverable production unit.
Examination and test records of the quality conformance sample shall
be maintained and shall be available to the procuring activity.
4.3.2.1
Quality Verification Test Data Report. Each quality
conformance sample tested in accordance with 4.5.4.1, shall be
logged on the Quality Verification Test (QVT) data report depicted in
Figure 3.
13
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |