Click here to make tpub.com your Home Page

Page Title: Test equipment and setup
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-L-23822C(AS)
4.3.3
Production monitoring sample. AQM-37A missile
targets, including the LR64 rocket engine and associated equipment
(see 3.1) will be selected from the accepted target production lot,
in number determined and flight tested by the Government, as the
production monitoring sample.
Reliability sample.  The reliability sample shall
4.3.4
consist of the entire quality conformance sample and shall meet
the requirements of 3.6.
Preproduction tests. The preproduction sample,
4.4
after having satisfactorily passed the examinations listed in
4.5.1, shall be subjected to the tests specified in Table IV.
TABLE
W
Test conditions. Except as specifically required
4.4.1
under the tests of 4.4.3, ambient test conditions shall be as follows:
+10F to +125 F
a.
Temperature
Up to 95 percent relative maxim
b.
Humidity
Normal ground
c.
Altitude
None
d.
Vibration
Test equipment and setup.  The designated testing
4.4.2
activity shall furnish and maintain all necessary test equipment and
facilities and personnel for performing all preproduction tests.
The test equipment and facilities shall be adequate in quantity, and
unless definite requirements are specified, shall be of sufficient
accuracy and quality to permit performance of the required prepro-
duction tests.
14

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business