Click here to make tpub.com your Home Page

Page Title: Preproduction test data report
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-L-23822C(AS)
4.4.2.1
Preproduction test data report.
The contractor
shall submit all data recorded in conducting preproduction tests
to the procuring activity for review and approval. The preproduc-
tion test data report shall include, but not necessarily be limited
to the following:
a.
Description of tests.
Photographs and description of methods and
b.
equipment.
c.
Chronological history of tests.
d.
Analysis of results.
Conclusions.
e.
f.
Recommendations.
Reduced data.
g.
h.
True copies of recorded data.
i.
Calibration data.
Performance evaluations with respect to
j.
specifications.
4.4.3
Preproduction test Procedures.
4.4.3.1
Static exposure.
Two rocket engines and the propellants shall
a.
be subjected  to an equilibrium temperature
of -65 F 3 F for 96 hours and without warm-
ing up then static fired at -65 F. Results of
the firing shall indicate compliance with the
requirements of 3.4.
b.
Three rocket engines and the propellants shall
be subjected to  an equilibrium temperature
of +140 F 3 F for 96 hours and then static
fired at +140 F. The results of the firing
shall indicate compliance with the requirements
of 3.4.
4.4.3.2
Temperature cycling.  Four rocket engines and the
propellants shall be subjected to each of the equilibrium temperature
levels, 3 F, listed below for a minimum of 2 hours at each level.
Number of Units
Temperatures
-65F. +140F. -65F.
4
+140F.  -65F. +140F.
4
15

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business