Click here to make tpub.com your Home Page

Page Title: Submission of product
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-L-48063A(MI)
3.7 Workmanship.  Workmanship shall be of the highest quality
consistent with the requirements to produce an end item of maximum reliability.
Particular attention shall be given to the following:
a. Freedom from blemishes, burrs, defects, and sharp edges.
Approved defect standards may be established.
b. Accuracy of dimensions, radii of fillets, and marking of parts
and assemblies.
c.  Thoroughness of soldering, welding, brazing, painting, wiring,
and riveting.
d. Alignment of parts and tightness of assembly screws and bolts.
3.7.1 Riveting.  Riveting operations shall be carefully performed to
insure that rivets are tight and satisfactorily headed.
3.7.2 Cleaning.  The launcher shall be thoroughly cleaned. Loose,
spattered, or excess solder, metal chips, and other foreign material shall
be removed during and after final assembly.
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection.  Unless otherwise specified in the
contract or Purchase order, the supplier is responsible for the performance
of all inspection requirements as specified herein. Except as otherwise
specified in the contract or order, the supplier may use his own or any
other facilities suitable for the Performance of the inspection requirements
specified herein, unless disapproved by the Government. `The Government
reserves the right to perform any of the inspections set forth in the
specification where such inspections are deemed necessary to assure supplies
and services conform to prescribed requirements.  Reference shall be made to
MIL-STD-109 to define terms used herein.  The provisions of MIL-A-2550 shall
apply.
4.1.1 Submission of product.  At the time each completed lot of items
deliverable under the contract is submitted to the Government for acceptance,
the contractor shall supply the following information accompanied by a
certificate which attests that the information provided is correct and
applicable to the product being submitted:
a. A statement that the lot complies with all of the quality assurance
provisions specified in this specification.
b. Drawing and specification number and date, together with identification
and date of changes thereto,
8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business