|
| ![]() MIL-L-48063A(MI)
107. Toggle switch missing, damaged,
or improperly assembled . . . . . . . . . . . . . . . . . Visual
Dust caps missing, damaged, or
108.
improperly assembled . . . . . . . . . . . . . . . . . . . Visual
Barrier, electromagnetic shielding
109.
missing, damaged or improperly assembled, Visual
AQL 1.00 percent
Minor:
201.
Identification, warning, fairing
and instruction plates missing,
damaged, illegible, or unpreserved . . . . . . Visual
202.
Evidence of poor workmanship
(see 3.7) . . . . . . . . . . . . . . . . . . . . . Visual
4.3.2.14 Launcher, rocket, LAU 68B/A shipping assembly
(see dwg. 356AS1OO).
Categories
Defects
Method of Inspection
100
percent
Critical:
1.
Safe and arm device missing, damaged,
or improperly assembled . . . . . . . . . . . . . . Visual
Major:
AQL 1.00 percent
101.
Missing parts on shipping
cover assembly . . . . . . . . . . . . Visual
Improper fabrication of
102.
shipping cover assembly . . . . . . . . Visual
Minor:
AQL 1.00 percent
201.
Lock wire missing from
mounting lugs . . . . . . . . . . . . . . . . . .Visual
Evidence of poor workmanship
202.
(see 3.7). . . . . . . . . . . . . . . . . . . . . . . Visual
4.3.3 Testing.
4.3.3.1 Spring embrittlement. Major defects: Detent (see dwg.
356AS143), Flat Spring (see dwg. 356AS113), Compression Spring (see dwg.
356AS119), Lever (see dwg. 356AS184).A sample of 10 springs shall be
selected from each lot, if one or more springs break before permanent
distortion, the lot shall be rejected. The test shall be conducted
as specified in 4.4.1 using equipment in accordance with 4.3.4.
20
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |