|
| ![]() MIL-L-48385 (PA)
DRAWINGS
U.S. ARMY PICATINNY ARSENAL
9271910 - Extension Line and Spool Assembly
(Copies of specifications, standards and drawings required
by contractors in connection with specific procurement
functions should be obtained from the procuring activity or
as directed by the Contracting Officer).
REQUIREMENTS
3.
3.1 Material. - Materials and parts shall be in accord-
ance with applicable drawings and specifications.
3.2 Extension Line and Spool Assembly. - The extension
line and spool assembly shall comply with all requirements
specified on Drawing (dwg.) 9271910 and with all requirements
specified in applicable specifications.
3.3 Workmanship. - All parts and assemblies shall be fab-
ricated and finished in a thorough workmanlike manner. They
shall be free of burrs, chips, sharp edges, cracks, crazes,
unblended radii, porosity, warpage, burn marks, checks, chipped
edges, blisters, excess flash, dirt, grease, rust, salt de-
posits, visible raised cement seams, solder splash, corrosion
products, and other defects and foreign matter which would affect
their serviceability. The cleaning method used shall not be
injurious to any part nor shall the parts be contaminated by
the cleaning agent. All required markings shall be neat, legible
and sharply defined.
3.4 First article inspection. - This specification contains
technical provisions for the first article inspection. Require-
ments for the submission of first article samples by the con-
tractor shall be as specified in the contract.
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for Inspection and Standard Quality
Assurance provisions. - Unless otherwise specified herein or
in the contract, the provisions of MIL-A-48078 shall apply
and are hereby made a part of this detail specification.
2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |