|
| MIL-L-60244A(MU)
4.2.2 Contractor testing. - When the contractor is responsible for
conducting first article approval tests, the sample shall be inspected by
the contractor for all the requirements of the contract. The sample and
a record of this inspection, including certificates of conformance for
materials, shall be submitted to the Government for approval. The Government
reserves the right to witness the contractor's inspection.
4.3 Inspection provisions.
4.3.1 Submission of product.- Unless otherwise specified by the
contracting officer, inspection lot size, lot formation and presentation
of lots shall be in accordance with "Submission of product" provisions of
MIL-STD-105.
4.3.2 Examination and tests.- Components and subassemblies shall
he inspected in accordance with the inspection provisions contained in
MIL-F-13926, and the Supplementary Quality Assurance Provisions (SQAP)
listed in the technical data package (TDP). In the absence of SQAP'S,
the applicable Quality Assurance Provisions of MIL-F-13926 shall apply.
Examination and tests related to Section 3 herein shall be performed on
a single defect (individual characteristic) basis in accordance with MlL-
STD-105, and the sampling plans specified in Tables I, II and III herein.
Examinations and tests for packaging, packing and marking shall be in
accordance with MIL-P-14232 and Section 5 herein. The tabulated classifi-
cation of defects in Tables I, II and III shall constitute the minimum
inspection to be performed by the supplier after first article approval
and prior to Government acceptance or rejection by item or lot.
TABLE I - CLASSIFICATION OF DEFECTS
4.3.3 Acceptance and rejection.- Rejected lots shall be screened
for all defective characteristics. Removal or correction of defective
units and resubmittance of rejected lots shall be in accordance with
"Acceptance and rejection" as specified in MIL-STD-105.
4..4 Special sampling.
4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |