| ![]() MIL-L-85532(AS)
That the approval of the first article sample,
b.
or the waiving of the first article inspection}
shall not relieve the contractors of their
obligation to fulfill all other requirements of
specification, drawing list, and contract.
First produced loader. Any changes or deviations of
6.4
production loaders from the approved first produced loader during
production will be subject to the approval of the contracting officer,
Approval of the first produced loader will not relieve the contractors of
their obligation to furnish loaders conforming to the specification.
Incident report. When the contractor conducts the
6.5
tests specified herein, a preliminary written report shall be furnished
to the contracting officer within 24 hours of any incident of equipment
malfunction or failure during the testing. As a minimum, the report
shall describe components and parts affected, test and operating conditions,
date of incident, hour meter reading, how detected and description of
incident. A final report shall be submitted within 15 days.
Definitions.
6.6
Failure. A failure is classified as any condition
6.6.1
that will preclude acceptance of the equipment for compliance with test/
Inspection requirements specified herein, Failure actions of MIL-STD-
781, paragraph 5.6, shall apply.
Preparing activity:
Navy - AS
(Project No, 1740-N142)
|