| MIL-L-85532(AS)
Time frame required for submission of first
g.
produced loader.
h.
Whether fungus and moisture resistance is
required (see 3.6).
Whether electromagnetic radiation emission
i.
protection in accordance with MIL-STD-461 is
required (see 3.8.4).
6.2.2
Data requirements. When this specification is used
in an acquisition which incorporates a DD Form 1423, Contract Data
Requirements List (CDRL) the data requirements identified below shall be
developed as specified by an approved Data Item Description (DD Form
1664) and delievered in accordance with the approved CDRL incorporated
into the contract. When the provisions of DAR 7-104.9 (n) (2) are
invoked and the DD Form 1423 is not used, the data specified below shall
be delivered by the contractor in accordance with the contract or
purchase order requirements. Deliverable data required by this
specification is cited in the following paragraphs.
Applicable DID no.
Data requirements
Paragraph no.
Options
Inspection system program
---
DI-R-4803
(a) 4.1.1
plan
---
inspection and test
(b) 4.4.3
reports
---
Inspection and test
(c) 4.5.1
reports
(a) 6.5
Failure report
UDI-R-21141 ---
(Copies of DID's required by contractors in connection with specific
acquisition functions should be obtained from the Naval Publications and
Forms Center or as directed by the contracting officer.)
6.3
First article inspection. Contracts or orders
should specify the following provisions for the first article inspection.
Whether first article inspection is required. When
6.3.1
a contractor is in continuous production of the loader from contract to
contract, consideration should be given to waive the first article
inspection If first article inspection is required, indicate:
a.
Whether the first article inspection is to be
conducted at the contractor's plant, Government
or other facilities.
|