|
| MIL-L-85546B(AS)
Method
Inspection
Number of
Requirement
paragraph
paragraph
Visual
4.6.1
3.3
Environmental
High temperature
4.6.2
3.4
Low temperature
4.6.3
3.4
Humidity
4.6.4
3.4
Performance
4.6.5
Recycle time and amperage (M101)
3.5.1
Firing pin penetration (M102)
4.6.6
3.5.2
4.6.7
Discharge time and voltage (M103)
3.5.3
1/ Samples consist of five launchers
and five sets
of unassembled metal parts.
2/ Samples consist of five launchers.
4.5 Qu alitv co nformance inspection. Quality conformance inspection shall
consist of Group A inspection (see 6.6.1) specified In table II.
Group A inspect ion.
TABLE II.
Requirement
Method
Inspection
Sampling
procedures
paragraph
paragraph
Visual
4.5.2
4.6.1
3.2, 3.6
Performance
Recycle time and amperage (M1OI)
3.5.1
Firing pin penetration (M102)
3.5.2
Dlscharge time and voltage (M103)
An inspection lot shall be as defined in MIL-STD-105
4.5.1 Inspec tion lot
and shall consist of all launchers offered for Inspection during a period of 1
month provided the homogeneity requirements of inspection lots have been retained.
4.5.2 Sa mpling plan. The size for visual inspection shall be in accordance
with MIL-STD-105, inspection level II.
4 . 5 . 3 I n d i v i d u a l i n s p e ction. Individual inspection is inspection conducted
on each launcher (100 percent inspection). Failure to pass inspection shall be
cause for rejection of the launcher.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |