|
| MIL-L-85776A(AS)
3.2.1 Recyc led virgin and reclaimed materials. There is no exclusion to the
use of recycled or reclaimed materials and no mandate for the use of virgin
materials provided it meets the requirements of this specification.
The launcher shall be of design, construction,
3.3 Desiqn and construction.
and physical dimensions specified on the drawings and specifications listed on
DL1335AS700 and DL1335AS900.
The launcher shall be capable of exposure
3.4 Environmental conditioning.
to high temperature, low temperature, and humidity without degradation of
performance (see 4.6.2, 4.6.3, and 4.6.4).
3.5
Performance.
Recycle time and amperaqe (M101). When operated with a fully charged
3.5.1
battery, the time required for monitared voltage to regain a level of 195 20
volts direct current (Vdc) for subsequent actuation shall be not greater than 360
The amperage from the battery, at the end of this time, shall be not
seconds.
greater than 140 milliamperes (see 4.6.5).
3.5.2 Firing pin penetration (M102). When actuated, the firing pin shall
produce a 0.015 inch minimum deep depression without rupture in the percussion
primer of the PVU-3B/E igniter, Drawing 1335AS260, or the PVU-3A/E igniter,
Drawing 1335AS275 (see 4.6.6).
After removal of the enable
3.5.3 Discharge time and voltage test (M103)
plug, the time for the voltage drop from 195 20 volts to not greater than 50
volts shall be not greater than 4 seconds (see 4.6.7).
The workmanship requirements are as specified on the
3.6 Workmanship.
Workmanship and finish shall be in accordance with
drawings and the following.
the highest grade practice used in manufacturing military weapons. Finished
items and parts shall not exhibit poor material and processing such as seams,
laps, laminations, cracks, visible steps, sharp edges, nicks, scratches, burrs,
deformations, and missing operations which may affect serviceability, functioning,
Fins and other extraneous metal shall be
operation, appearance, or safety.
removed from cast or forged parts. Hammering to shape, salvage operations
(including repair by welding), or other similar practices shall not be permitted
without prior approval of the contracting officer.
No part or assembly shall
contain chips, dirt, grease, rust, corrosion, or any other foreign matter.
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection
Unless otherwise specified in the
contract or purchase order, the contractor Is responsible for, the performance of
Except
all inspection requirements (examinations and tests) as specified herein.
as otherwise specified in the contract or purchase order, the contractor may use
his own or any other facilities suitable for the performance of the inspection
The
requirements specified herein, unless disapproved by the Government.
Government reserves the right to perform any of the inspections set forth in this
specification where such inspections are deemed necessary to ensure supplies and
services conform to prescribed requirements (see 6.2).
3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |