Click here to make tpub.com your Home Page

Page Title: Thermal seam bonding
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-L-85824A(AS)
When Inspected as specified in 4.8.7,
3.8.6 Thermal seam bonding.
the force required to separate each thermal seam specime shall not be less than
40 pounds.
3.8.7 Extreme temperature.
3.8.7.1 At zero `Fahrenheit (minus eighteen "Celsius).
When tested
as specified In 4.8.8.1, the life raft shall inflate to design shape within
Inflation shall be without any hindrance to the flow of carbon
twenty minutes.
dioxide or restriction by any component or accessory. All the seams and cemented
attachments shall remain perfectly intact and shall show no evidence of
There shall be no evidence of construction or material failure in
separation.
any respect.
3.8.7.2 At one hundred sixty `Fahrenheit (seventy one `Celsius).
When tested as specified in 4.8.8.2, the life raft shall Inflate to design shape
Inflation shall be without any hindrance to the flow of
within thirty seconds.
All the seams and
carbon dioxide or restriction by any component or accessory.
cemented attachments shall remain perfectly intact and shall show no evidence of
There shall be no evidence of construction or material failure in
separation.
any respect.
When visually examined and
3.9 Visual examination and dimensions.
dimensionally checked as specified in 4.8.1.1, the life raft and its components
shall conform to this specification and applicable drawings,
The life raft shall be folded in accordance with drawing
3.10 Folding.
1521AS200.
The oral inflator assemblies shall lie flat and point in their proper
directions.
After completion of the final assembly, the life raft
3.11 Workmanship.
shall be thoroughly cleaned and all loose thread, lint, and foreign matter shall
The metal components shall not be misaligned nor contain any sharp
be removed.
The life raft shall not contain any
edge, crack, dent, nick, burr, or sliver.
spot, stain, non-specified hole, abraded area, tear, cut, mend, or needle chew.
Because of the emergency and life support use of this equipment, the importance
of providing a product of uniform excellent quality cannot be overemphasized.
The life raft shall be uniform in quality and shall be free from irregularities
or defects which could adversely affect performance, reliability, or durability.
The life raft shall conform to the quality grade of product established by this
The occurrence of defects shall not exceed the acceptance
specification.
criteria established herein.
4.
QUALITY ASSURANCE PROVISIONS
4.1 Responsibllity for inspection.  Unless otherwise specified in the
contract or purchase order, the contractor is responsible for the performance of
Except as otherwise specified
all inspection requirements as specified herein.
in the contract or purchase order, the contractor may use his own or any other
facilities suitable for the performance of the inspection requirements specified
The Government reserves the right
herein, unless disapproved by the Government.
to perform any of the inspections set forth in the specification, where such
Inspections are deemed necessary to assure supplies and services conform to
prescribed requirements.
All items must meet all requirements of
4.1.1 Responsibility for compliance.
The inspections set forth in this specification shall become
sections 3 and 5.
6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business