|
| ![]() MIL-M-13703D(AR)
3.3.4 Color. A salt water solution shall be yellow-green
color, when tested as specified in 4.5.1.4.
3.3.5 Particle size. One hundred percent of the filler shall
pass through a Us. Standard No. 40 sieve, when tested as specified
in 4.5.1.5.
The filler shall not cake or
3.4 Temperature humidity test.
lump when tested as specified in 4.5.2.
3.5 Drop test.
3.5.1 Five foot drop test. The marker (dwg. 9224950) contained
in the barrier bag shall not rupture when dropped from a height of
five (5) feet, when tested as specified in 4.5.3.1.
3.5.2 Fifty foot drop test. The marker (dwg. 9224950) shall
burst and produce a minimum opening of four (4) inches when dropped
from a height of fifty (50) feet when tested as specified in 4.5.3.2.
3.6 Workmanship. All components and filler shall be free of
dirt, grease and other foreign materials.
QUALITY ASSURANCE PROVISIONS
4.
4.1 Responsibility for inspection and standard quality
Unless otherwise specified herein or in the
assurance provisions.
contract, the -provisions of MIL-A-48078 shall apply and are hereby
--
made a part of this detail specification.
4.2 Classification of inspections. The following types of
inspection shall be conducted on this item:
First Article Inspection
a.
Quality Conformance Inspection
b.
4.3
First article inspection.
4.3.1 Submission. The contractor shall submit a first article
sample as designated by the Contracting officer for evaluation in
accordance with provisions of 4.3.2 and 4.3.3. The first article
sample shall consist of the following items and sample quantities as
indicated in Table I:
4.3.2 Inspections to be performed.
See MIL-A-48078 and Table I
specified herein.
Rejection.
See MIL-A-48078.
4.3.3
.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |