MIL-M-29399(MC)
is granted, unless extended by the Government to other contracts.
First article tests shall be performed on sample units which have
been produced with equipment and procedures normally used in
production.
4.3.1 Nonconformance of first articles.  In the event the first
articles fail to meet the requirements of 4.3.2, the contractor shall
submit plans for corrective action to the procuring activity for
approval. Any failure in the inspections and tests shall be cause
for the unit to be rejected. Any rejected unit may be reworked and
resubmitted for first article testing. Production testing shall not comence
until first articles have passed first article inspection and tests.
.
4.3.2 First article inspection and testing. The first articles shall
be subjected to the examination and tests specified in Table I, in
the order shown.  Each first article shall be installed and checked out
on the LVTP7A1 vehicle prior to first article test. All first article
tests shall be conducted on each first article to determine confor-
mance with the requirements specified herein.
4.4 Quality conformance inspection.  Quality conformance inspection
shall consist of the examination and tests specified in Table I.
Each MCSK accepted by the Government shall have successfully completed
all quality conformance inspections and tests.
4.4.1 Rejection and retest.  Any MCSK which fails any of the qual
conformance tests shall be rejected.  The rejected MCSK may be
reworked or have parts replaced to correct defects.  The MCSK shall
be completely retested to demonstrate that the requirement meets the
requirements specified herein.
4.5 Inspection and test
4.5.1 Inspection and test conditions.  Unless otherwise specified
herein, all inspections and tests shall be performed in accordance
with the test conditions specified in MIL-S.TD-810.
4.5.2 Visual examination.  The system shall be visually examined
to verify conformance to 3.3 and 3.7.
4.5.3 Material inspection.  The contractor shall certify that
all materials and parts used in the fabrication of the MCSK are
in accordance with requirements specified herein. Material or
part manufacturer's certification of test data will be accept-
able for fulfilling this requirement. Acceptance or approval
of any material or part shall not be construed as a guarantee of
acceptance of the MCSK.