|
| MIL-M-29399(MC)
(4) Station a line handler on each side of the ramp
to handle safety line during off-loading.
g. With the two line handlers manning the safety rope, continue
to pull the container out of the vehicle onto the ramps (using
Continue off-loading until container is near end
capstan).
of ramps.
h.
Disengage capstan rope and safety rope from container.
i. Repeat actions described in c. through g., of this test,
as required to off-load remaining containers.
Remove and stow loading ramps
j. Turn off capstan power.
and close ramp.
20
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |