Click here to make tpub.com your Home Page

Page Title: Sampling and inspection.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-38510/141B
TABLE II. Electrical test requirements.
Subgroups (see table III)
MIL-PRF-38535
Class S
Class B
test requirements
devices
devices
Interim electrical parameters
1
1
Final electrical test parameters
1*, 2, 3, 9
1*, 2, 3, 9
Group A test requirements
1, 2, 3, 9
1, 2, 3, 9
Group B electrical test parameters when
1, 2, 3, and
N/A
using the method 5005 QCI option
table IV
delta limits
Group C end-point electrical
1, 2, 3, and
1 and
parameters
table IV
table IV
delta limits
delta limits
Group D end-point electrical
1, 2, 3
1, 2, 3
parameters
*PDA applies to subgroup 1.
4. VERIFICATION.
4.1 Sampling and inspection. Sampling and inspection procedures shall be in accordance with MIL-PRF-38535 or
as modified in the device manufacturer's Quality Management (QM) plan. The modification in the QM plan shall not
effect the form, fit, or function as described herein.
4.2 Screening. Screening shall be in accordance with MIL-PRF-38535, and shall be conducted on all devices prior
to qualification and quality conformance inspection. The following additional criteria shall apply:
a.
The burn-in test duration, test condition, and test temperature, or approved alternatives shall be as specified
in the device manufacturer's QM plan in accordance with MIL-PRF-38535. The burn-in test circuit shall be
maintained under document control by the device manufacturer's Technology Review Board (TRB) in
accordance with MIL-PRF-38535 and shall be made available to the acquiring or preparing activity upon
request. The test circuit shall specify the inputs, outputs, biases, and power dissipation, as applicable, in
accordance with the intent specified in test method 1015 of MIL-STD-883.
b.
Interim and final electrical test parameters shall be as specified in table II, except interim electrical
parameters test prior to burn-in is optional at the discretion of the manufacturer.
c.
Additional screening for space level product shall be as specified in MIL-PRF-38535.
4.3 Qualification inspection. Qualification inspection shall be in accordance with MIL-PRF-38535.
11

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business