Click here to make tpub.com your Home Page

Page Title: Technology Conformance Inspection (TCI).
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-38510/70C
4.3 Screening. Screening shall be in accordance with MIL-PRF-38535 and shall be conducted on all devices prior
to qualification and conformance inspection. The following additional criteria shall apply:
a. The burn-in test duration, test condition, and test temperature, or approved alternatives shall be as
specified in the device manufacturer's QM plan in accordance with MIL-PRF-38535. The burn-in test
circuit shall be maintained under document control by the device manufacturer's Technology Review
Board (TRB) in accordance with MIL-PRF-38535 and shall be made available to the acquiring or
preparing activity upon request. The test circuit shall specify the inputs, outputs, biases, and power
dissipation, as applicable, in accordance with the intent specified in test method 1015 of MIL-STD-883.
b. Interim and final electrical test parameters shall be as specified in table II, except interim electrical
parameters test prior to burn-in is optional at the discretion of the manufacturer.
c. Additional screening for space level product shall be as specified in MIL-PRF-38535.
4.4 Technology Conformance Inspection (TCI). Technology conformance inspection shall be in accordance with
MIL-PRF-38535 and herein for groups A, B, C, and D inspections (see 4.4.1 through 4.4.4).
4.4.1 Group A inspection. Group A inspection shall be in accordance with table III of MIL-PRF-38535 and as
follows:
a. Tests shall be as specified in table II herein.
b. Subgroups 4, 5, 6, 7, and 8, shall be omitted.
4.4.2 Group B inspection. Group B inspection shall be in accordance with table II of MIL-PRF-38535.
4.4.3 Group C inspection. Group C inspection shall be in accordance with table IV of MIL-PRF-38535 and as
follows:
a. End point electrical parameters shall be as specified in table II herein.
b. The steady-state life test duration, test condition, and test temperature, or approved alternatives shall be as
specified in the device manufacturer's QM plan in accordance with MIL-PRF-38535. The burn-in test circuit
shall be maintained under document control by the device manufacturer's Technology Review Board (TRB)
in accordance with MIL-PRF-38535 and shall be made available to the acquiring or preparing activity upon
request. The test circuit shall specify the inputs, outputs, biases, and power dissipation, as applicable, in
accordance with the intent specified in test method 1005 of MIL-STD-883.
4.4.4 Group D inspection. Group D inspection shall be in accordance with table V of MIL-PRF-38535. End-point
electrical parameters shall be as specified in table II herein.
4.5 Methods inspection. Methods of inspection shall be as specified in the appropriate tables and as follows:
4.5.1 Voltage and current. All voltages given are referenced to the microcircuit ground terminal. Currents given
are conventional current and positive when flowing into the referenced terminal.
7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business