|
| ![]() MIL-M-45945A
6.8 Results of tests. Reports of the resuits of final
examination and function firing, targeting and accurracy
endurance, and interchangeability tests shall be specified for
delivery on the DD Form 1423 included in the c o n t r a c t .
6.9 MIL-9858 or MIL-I-45208. When warranted the contract
should specify the application of MIL-Q-9858 or MIL-I-45208 as
appropriate, on the Management Control Summary List, DD Form
1660.
6.10 MIL-I-45607 and MIL-STD-45662. Unless otherwise
specified (see 6.2.1),the contract should specify the
application of MIL-I-45607 and MIL-STD-45662 on the Management
Control Summary List DD Form 1660.
6.11 Drawings. Drawings listed in Section 2 of this
specification under the heading US A- Armament Research,
Development, and Engineering Center (ARDEC) may also included
drawing prepared by,and identified as US Army Armament Research
and Development Center (ARDC) , US Army Armament Research and
Development Command (ARRADCOM) , Edgewood Arsenal, Frankford
Arsenal, Rock Island Arsenal, Picatinny Arsenal and Springfield
Technical data originally prepared by these
Armory drawings.
activities are now under the cognizance of ARDEC.
listing
Subject term (keyward
6.12
Air cooled
Gas Operated
Infantry Weapon
Link, Belt Fed
6.13 Submission of alternative quality conformance
provisions. Unless otherwise specified in the contract, proposed
alternative quality conformance provisions will be submitted by
the contractor for evaluation by the technical activity respon-
sible for the preparation of this specification.
6.14 Changesfrom previous issue Asterisks are not used in
this revision to identify changes with respected to the previous
issue due to the extensiveness
Preparing
activity
Custodian:
Army-AR
Army-AR
Navy-MC
(Project 1005-0824)
Air Force-84
45
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |