Click here to make tpub.com your Home Page

Page Title: Sampling plans.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-48245B(AR)
In addition, the first
See MIL-A-48078.
4.3.3  Rejection.
article quantity shall be rejected if any of the following occur:
a.  The certification for either of the two silicas reveal
any failure to comply with any of the requirements specified on the
applicable drawing.
b.  The certifications for the base resin or the hardener
is incomplete or indicates any constituent is missing.
The base resin or hardener exceeds the maximum
c.
viscosity.
d.  The "molding compound tested fails to comply with any of
the requirements listed in Table I and Table II, or fails to comply
with the color requirement of 3.6.
Inspection lots shall comply
Inspection lot formation.
4.4.1
In addition,
with the lot formation provisions of MIL-A-48078.
inspection lots of base resin or hardener shall consist of that
quantity of material produced from the same batch of raw material
and which is both manufactured and offered for acceptance at one
time.
See MIL-A-48078.
4.4.2
Examination.
Unless otherwise specified in the
Sampling plans.
a.
Classification of Defects and Testing, sampling plans for major and
minor defects shall be in accordance with MIL-STD-105 Inspection
Level II.
Material samples in accordance with
Inspection.
b.
4.4.2.a for Quality Conformance Inspection shall conform to the
requirements of 4.4.2.1 to 4.4.2.6.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business