Click here to make tpub.com your Home Page

Page Title: Requalification.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-63324A(AR)
4.3.1 Submission.  The contractor shall submit a first article
sample as designated by the Contracting Officer for evaluation in
accordance with the provisions of 4.3.2.  The first article
inspection lot size after screening shall consist of fifty (50)
devices, minimum.
4.3.2 Inspection to be performed. First article inspection
shall be in accordance with the applicable requirements of
MIL-M-38510 and as modified by this specification, except that the
procuring agency shall be the qualifying activity. First article
requirements shall consist of inspections specified in subgroups "a"
through "g" listed in TABLE III. First article items may be
subjected by the qualifying activity (Government) to all of the
l xaminations and tests specified in this specification and to any
requirements of the applicable drawings.
a. Screening.  Screening shall be performed on all devices
in accordance with the inspection flow specified in TABLE II.
Rejection.  If any device fails to comply with any of the
4.3.3
applicable
requirements, the first article sample shall be
rejected.
The Government reserves the right to terminate its
upon any failure of a device in the sample to comply with
inspection
stated requirements.
any of the
4.3.4  Requalification.  The device shall be subjected to
another First Article as stipulated in the contract if:
a. The contractor's manufacturing techniques or process
controls which affect the form, fit, function or-internal geometry
of the device are revised by either the contractor or one of his
sub-contractors supplying parts or assemblies.
The contractor relocated his assembly facilities.
b.
c. The contractor uses a new sub-contractor for material,
parts, or assembly.
d.
A change occurs in devices's material, performance or
assembly.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business