Click here to make tpub.com your Home Page

Page Title: Safe condition and circuit continuity verification
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-63457A(AR)
APPENDIX A
Applicable
20.3
Order of precedence.
30.
REQUIREMENTS
Applicable.
30.1
Material.
30.2 Components and assemblies.  This paragraph is applicable
except that Dwg. 9330381 is replaced by Dwg. 9349483.
30.3  Safe condition and circuit continuity verification.
Appli cable.
30.3. 1
S&A assembly.
Applicable.
30.3. 2
Electronics.
Applicable.
Soldering.
Applicable.
30.4
Explosive output performance.
Not Applicable.
30.5
Pretest of booster explosive. Not Applicable.
30.5. 1
30.5. 2
Pretest of main charge explosive.
Not Applicable.
30.6
Mine functioning.
Applicable.
30.6. 1 Arming delay.
Applicable.
30.6. 2 Tactical HE mines.
Applicable, with the title changed to
"Test Mines".
30.6. 2.1 Prime target sensor mode functioning.  Applicable when
modif ied to read "the armed mine subjected to a valid signature
shall produce a high order detonation (See 60.6)".
30.6. 2.2  Self-destruct (SD) function.  This paragraph is applicable
with the phrase "of the main charge" deleted.
30.6.3
Functioning after maximum time.
Applicable.
30.7 Controls of adhesives.
Applicable.
30.8  Documentation of plan for safety in handling and processing of
munitions.  Applicable.  Additionally, this plan shall include the
procedures that will be used to assure total segregation of the Mine
Assembly, BLU 91B, Test (AT-40) from the Tactical BLU 91/B and Test
BLU 91/B (AT-20) (Components and subassemblies).
30

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business