Click here to make tpub.com your Home Page

Page Title: Contract data requirements.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-63530 (AR)
6.3 Submission of inspection equipment designs for approval.
(See
4.4.4 ).  Submit equipment designs as required to Commander, ARRADCOM, ATTN
DRDAR-QAA-1, Dover, NJ " 07801
6.4 Drawings.  Drawings listed in section 2 of this specification under
the heading U.S. Army Armament Research and Development Command (ARRADCOM) may
also. include drawings prepared by, and identified as Edgewood Arsenal,
Frankfort! Arsenal, Rock Island Arsenal or Picatinny Arsenal drawings. "
Technical data originally prepared by these activities is now under the
cognizance of ARRADCOM.
6.5 Distribution of shop traveler(s), inspection and test results,
process controls.  Shop traveler(s), inspection and test results (3.7,
4.5.20), and process controls (3.8) shall be sent to:  Commander, U.S. Army
Armament Research and Development Command, ATTN:  DRDAR-QAA-M, Dover, NJ
07801.
6.6 Contract data requirements.
a.  Contract data requirements for inspection equipment designs shall
conform to data item description DI-E-1118 or DI-I-1714 with the appropriate
addendum to each.
b.
Shop traveler(s) shall be submitted.
c.  Process control documents shall be submitted in accordance
with DI-P-1604 (Mod) with attachment i listed on DD Form 1423 incorporated in
the contract.
d.  Contract data requirements for quality inspection test report in
accordance with Data Item Description DI-R-1724 (tailored] giving the detailed
test results.
22

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business