Click here to make tpub.com your Home Page

Page Title: Welding and brazing.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-63984 (AR)
The slide handle clip of
3.3  Pull test of slide handle clip.
the base cover assembly (Dwg. 754 8146) shall show no evidence of
breakage when subjected to the pull test as specified in 4.5.3.
3.4 Functioning.  The mine shall function satisfactorily when
tested as  specified in 4.5.5. satisfactory functioning shall be
evidenced by functioning of the fuze, activator and firing device
and no mine assembly being damaged beyond reuse.
3.5 First article inspection.  This specification contains
technical provisions for first article inspection.  Requirements for
the submission of first article samples by the contractor shall be
as specified in the contract.
Workmanship.
3.6
All welds and brazes shall be
3.6.1  Welding and brazing.
reasonably smooth and free of craters.  They shall exhibit
characteristics of good fusion, penetration, and soundness of
The
deposit representative of good welding and brazing practice.
There
process shall be such as to prevent warpage and distortion.
shall be no crack in or near welded or brazed areas.
All parts and assemblies shall be
3.6.2  Workmanship.
fabricated and assembled in a thorough,  workmanlike manner.  They
shall be free of burrs, chips, weld spatter, sharp edges, chipped
edges, gouges, cracks, surface defects, dirt, grease, rust,
The cleaning method
corrosion products, and other foreign matter.
used shall not be injurious to any part nor shall the parts be
contaminated by the cleaning agents.  All required markings shall be
External threads shall be full, complete
neat and sharply defined.
and undamaged for their entire length.
4.
QUALITY ASSURANCE PROVISIONS
4.1  Responsibility  for inspection and standard quality
assurance provisions.
Unless otherwise specified herein or in the
contract,  the provisions of MIL-A-48078 shall apply and are hereby
made a part of this detail specification.
4.2  Classification of inspections.  The inspection requirements
specified herein are classified as follows:
First article inspection (see 4.3).
a.
Quality conformance inspection (see 4.4).
b.
4.3
First article inspection.
3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business