| MIL-M-63984(AR)
The contractor shall submit a first article
4.3.1 Submission.
Sample as designated by the Contracting Officer for evaluation in
accordance with provisions of 4.3.2. The first article sample shall
consist of the following items in sample quantities as indicated
below and Table I.
Part Description
Drawings
25
7548124
7548128
10
7548129
10
7548130
10
7548131
10
7548133
10
7548134
10
7548135
10
10
7548136
7548138
10
7548139
10
7
548140
10
7548141
10
10
7548144
7546145
10
7548146
10
7548147
10
7548148
10
7548153
10
7548154
10
7548155
10
10
7548156
7548157
10
7548158
10
7548160
10
7548161
10
7548162
10
7548163
10
7548164
10
7548165
10
7548166
10
7548167
10
7548168
10
Wrench, Arming Plug Assembly 7548279
10
Wrench Arming
7548280
10
Bail
7548281
10
4.3.2
Inspections to be performed.
See MIL-A-48078 and Table
specified herein.
4.3.3
Rejection.
See MIL-A-48078.
|