Click here to make tpub.com your Home Page

Page Title: Figure 11. Breakwire continuity check.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-70779 (AR)
APPENDIX A
40.2.9 Detonator resistance.  The detonator resistance shall be
using an ohmmeter whose current output if 5.0 ma maximum between F and S. The
resistance measured shall be between the limits specified in Table I.
40.2.10 Gas generator//Piston actuator resistance.  The initiator in
parellel with the piston actuator resistance shall be measured using an
(or
ohmmeter whose current output is 5.0 ma maximum between T and
preform).  The resisitance measured shall be between the limits specified in
Table I.
40.2.11 Detonator short. The detonator short shall be measured using an
ohmmeter whose current output is 5.O ma maximum between F and
(or
preform). The resistance shall be within the limits specified in Table I.
40.2.12 Breakwire continuity.  The breakwire continuity shall be measured
by connecting the S.U.T. as shown in Figure 11.  A high logical output must be
present at both
and
Breakwire continuity check.
Figure 11.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business