|
| MIL-M-70821 {AR)
are DOD adopted are those listed in the issue of the DODISS
cited in the solicitation. Unless otherwise specified, the
issues of documents not listed in the DODISS are the issues of
the documents cited in the solicitation (see 6.2).
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTX)
ASTM D1744 - Petroleum Products, Liquid, Water In.
By Karl Fisher Regent
(Application for copies should be addressed to the American
society for Testing-and Materials, 1916 Race Street,
Philadelphia, PA 19103-1137.)
(Non-Government standards and other publications are normally
available from the organizations that prepare or distribute the
documents. These documeents also may be available in or through
libraries or other informational services.)
2.3 order of precedence. In the event of a conflict
between the text of this document and the references cited
herein, the text of this document shall take precedence.
Nothing in this document, however, supersedes applicable lasws
and regulations unless a specific exemption has been obtained.
REQUIREMENTS .
3.
3.1 First article. When specified in the contract or
purchase order, a sample shall be subjected to first article
inspection (see 4.4 and 6.2).
3.2 Materials. Materials shall conform to the material
specifications referenced on the applicable drawings.
Certification of material may be accepted in lieu of material
tests. The contractor shall be responsible for determining that
materials ~ assemblies, and parts requiring product qualifica-
tions are listed or qualified for inclusion on the applicable
Qualified Products Lists (QpL) l In the instance that a
qualified vendor no longer exists on the QPL, the contractor is
responsible for selecting a vendor whose product meets the
minimum requirement of the specification. The contractor must
also submit to the Government for approval documentation which
confirms the vendors ability to meet the specification in
question. Contractor's inspection record shall specifically
list such components, name of supplier (s) , and number and date
of applicable QPL or Government approved vendors not on a QPL.
3.3 Construction. The M182 Gun Mount, and all of its
assemblies and components, shall be constructed as specified in
MWO 9-2350-311-55-4 with dimensions and tolerances as specified
on the applicable drawings referenced on Drawing 12910860.
3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |