Click here to make tpub.com your Home Page

Page Title: Preparation for Shipment.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-81260A(AS)
3.6.6.9
Assembly. - Instructions shall parallel the requirements
outlined in 3.5. 3.4.8 and shall include special instructions, such as lapping,
fitting, sealing, etc, as applicable for depot maintenance.
3.6.6.10
Alignment and Adjustment. - Instructions shall parallel the
requirements, as outlined in 3.5.3.4.9, amplified to prescribe the critical to-
Ierance requirements for depot level maintenance.
3.6.6.11
Calibration. - Depot level calibration instructions shall be
provided, as required in accordance with MIL-M-38793.
Test Procedures. - Procedures shall contain essential ins-
3.6.6.12
tructions for conducting tests of the component or equipment after reassembly.
Preliminary data pertaining to specific testing conditions, test setup and general
operating procedures of peculiar test equipment shall be included. If applicable,
test equipment hook-up instructions shall be included for fabricating interconnecting
cable assemblies, etc, required for bench test set-ups and not normally supplied
with the equipment.
Complete procedures, test values and acceptable tolerances
3.6.6 .12.1
shall be provided for each test. When adjustments can be accomplished during
a test, without disassembling the equipment, those adjustment instructions shall
be integrated into the procedure in the proper sequence.
3.6.6 .12.2
When the equipment requires a run-in test prior to placing
in service, complete instructions shall be incorporated.
3.6.6.13
Trouble shooting - Data shall be provided identifying each
malfunction or symptom of malfunction; giving instructions for isolating the
cause to a specific component assembly, accessory or subassembly; and
specifying the remedy by replacement or adjustment, etc. When the test setup
for troubleshooting is different from that used during checkout, directions shall
be given for changing the test setup.
3.6.6.14
Preservation Requirements. - Instructions shall specify
Military approved methods and materials used to preserve the equipment during
storage. If the method utilized is the same as specified for reshipment, a state-
ment to that effect shall be included.
Preparation for Shipment. - This section shall contain the
3.6.6.15
following instructions explaining the use of any GSE, such as cradles, slings,
hoists, jigs, fixtures, etc, as required.  The instructions shall be supported by
the necessary illustrations and shall include all precautions necessary to pre-
vent damage to the equipment or injury to personnel.
38

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business