Click here to make tpub.com your Home Page

Page Title: Conflicting requirements.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-81392(AS)
6.4.6 Battery.  The term "battery" shall mean the Battery, Water
Activated Mk 72 Mod 1 as depicted in OS 8765.
6.4.7 Squib.  The term "squib" shall mean the Squib, Electric, Mk 13
Mod 0 depicted in Specification WS 4630.
6.4.8 Starter composition.  The term "starter composition" shall mean
the starter composition depicted in Specification WS 4626.
6.4.9 Sea water.  The term "sea water" as used in the static function-
ing test shall mean a sea water solution prepared by the following formula:
Ingredients
Grams
Sodium Chloride, Federal Spec
32.0 0.1
SS-S-550, Type II, Grade A
Magnesium Sulfate Heptahydrate
4.0 0.03
ASTM C 277-53
Dissolve the above ingredients in 500 + 5 milliters of distilled waters
then dilute the solution to volume of 1 .01 liter. As much solution as
needed may be made in multiples of this quantity.
6.5 Conflicting requirements.  Conflicting requirements arising between
this specification and any specification or publication listed herein shall
be referred in writing to the procuring agency for clarification.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business