Initial Production Tests - One of the first 10
4.3
production equipments shall be selected and sent at the
contractor's expense to a designated Government laboratory for
tests. This equipment shall be selected by the procuring activity
after the equipment has successfully passed all individual tests.
The preproduction sample shall not be selected for this test.
Scope of Tests - This equipment may be
4.3.1
subjected to any and all tests the procuring activity deems
necessary to assure that the production equipment is equivalent to
the previously approved preproduction sample in design,
construction, workmanship, performance and quality and that it
meets all applicable requirements.
Accessory Material - In addition to the
4.3.2
complete equipment submitted for Initial Production Tests the
contractor shall also submit such accessory material and data
necessary to test the equipment
Initial Production Sample Approval - Approval
4.3.3
of the Initial Production sample shall be by the procuring
activity upon satisfactory completion of all tests. Any design,
material or performance defect made evident during this test shall
be corrected by the contractor to the satisfaction of the
procuring activity. Failure of the Initial Production sample to
pass any of the tests shall be cause for deliveries of equipment
under the contract to cease until proper corrective action is
approved and accomplished. Corrective action shall also be
accomplished on equipment previously accepted when requested by
the procuring activity.
Reconditioning of Initial Production Test
4.3.4
Sample - On completion of the initial production test the
equipment shall be reworked by the contractor by replacing all
worn or damaged items. After reworking, the contractor shall
resubmit the equipment for acceptance.
Acceptance Tests - The contractor shall furnish
4.4
l
all samples and shall be responsible for accomplishing the
acceptance tests. All inspection and testing shall be under the
supervision of the government inspector. Contractor not having
.
testing facilities satisfactory to the procuring activity shall
engage the service of a commercial testing laboratory acceptable
to the procuring activity. The contractor shall furnish test
reports showing quantitative results for all acceptance tests.
Such reports shall be signed by an authorized representative of
the contractor or laboratory, as applicable. Acceptance or