Click here to make tpub.com your Home Page

Page Title: Initial Production Tests
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-N-81497A(AS)
Preproduction  Approval - Approval of the preproduction
4.2.3
sample shall be by the procuring activity upon satisfactory completion
of all test. Unless otherwise specified no production equipments
shall be delivered prior to the approval of the preproduction sample.
Prefabrication of production equipment prior to the approval of the
preproduction sample is at the contractor's own risk; unless specified
otherwise by the contract. The approved preproductin sample shall
be retained by the contractor for his use in the fabrication and
testing of equipment to be, submitted for acceptance. The preproduction
sample shall not be considered as one of the equipments under the contract.
Production Equipments - Equipments supplied under
4.2.4
the contract shall in all respects, including design, construction,
workmanship, performance and quality, be equivalent to the approved
preproduction sample. Each equipment shall be capable of success-
fully passing the same tests as imposed on the preproduction sample.
Evidence of non-compliance with the above shall constitute cause for
rejection and for equipment already accepted by the Government, it
shall be the obligation of the contractor to make necessary corrections
as approved by the procuring activity.
Initial Production Tests -  When requested by the
4.3
procuring activity one of the first ten production equipments shall be
delivered to a designated Government laboratory for tests. This equip-
ment shall be selected by the procuring activity after the equipment
has successfully passed all individual tests. The preproduction sample
shall not be selected for this test.
Scope of Tests - This equipment may be subjected
4.3.1
to any and all tests the procuring activity deems necessary to assure
that the production equipment is equivalent to the previously approved
preproduction sample in design, construction, workmanship, performance,
and quality and that it meets all applicable requirements.
Accessory Material - In addition to the complete
4.3.2
equipment submitted for Initial Production Tests the contractor shall
also submit such accessory material and data necessary to operate
the equipment.
Initial Production Sample Approval - Approval of the
4.3.3
Initial Production Sample shall be by the procuring activity upon
satisfactory completion of all tests. Any design, material, or perform-
ance defect made evident during this test shall be corrected by the
contractor to the satisfaction of the procuring activity. Failure of
the Initial Production Sample to pass any of the tests shall be cause
for deliveries of equipment under the contract to cease until proper
corrective  action  is  approved  and  accomplished.  Corrective  action
also be accomplished on equipment previously accepted when requested by
the procuring activity.
54

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business