Click here to make tpub.com your Home Page

Page Title: Examination of Product
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-N-85005A(AS)
Acceptance Tests - The contractor shall furnish all
4.4
samples and shall be responsible for accomplishing the acceptance tests.
All inspection and testing shall be under the supervision of the Government
inspector.  Contractors not having adequate facilities for conducting
all required tests shall engage the service of a commercial testing
laboratory acceptable to the procuring activity. The contractor shall
maintain test reports showing results for all acceptance tests. Such
reports shall be signed by an authorized representative of the con-
tractor or laboratory, as applicable. Acceptance or approval of material
during the course of manufacture shall not be construed as a guarantee
of the acceptance of the finished product. Acceptance tests shall
consist of the following:
(1) Individual Tests
(2) Sampling Tests
(3) Reliability Assurance Tests
(4)  Special Tests
Individual Tests - Each equipment submitted for acceptance
4.4.1
shall be subjected to the individual tests. These tests shall be adequate
to determine compliance with the requirements of material, workmanship,
operational adequacy and reliability. As a minimum, each equipment
accepted shall have passed the following tests:
(1) Examination of Product
(2) Operational Test
Examination of Product - Each equipment shall be examined
4.4.1.1
to determine that the material and workmanship requirements have been
met.
Operational Test - Each equipment shall be operated long
4.4.1.2
enough to permit the equipment temperature to stabilize and to check suf-
ficient characteristics and record adequate data to assure satisfactory
equipment operation.
*4.4.2
Sampling Tests - Equipments selected for sampling tests shall
first have passed the individual tests.  Equipments shall be selected for
sampling tests by the Government inspector in accordance with the following:
Quantity to be Selected
Quantity of Equipments
for Sampling Test
Offered for Acceptance
1
First 10
1
Next 50
1
Next 75
1 for each additional
Next 100
200 or fraction thereof
,
- 126 -

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business