| ![]() MIL-P-17881D(SHIPS)
(5) Duty.
(6) Enclosure.
(7) Winding (d.c.) or design of motors (a.c.).
(8) Bearings.
(9) Insulation.
(10) Power limitation, if any.
(11) Starting current limitation, if any.
Rotor cradLe (sea 3.8.2.5).
(l)
Number of sets of special tools (see 3.9.2.6).
(m)
Drawings required (see 3.9),
(n)
Manuals required and whether complete information for electrical equipment
(o)
is required (see 3.10.1, 3.10.3 and 3.10,6),
Whether design data and calculations and design record are required (see 3.11
(p)
and 3.12).
Quality assurance provisions (see 4.1.2).
(q)
Mercury prohibition (see 4.1.4).
(r)
Thrust test if required (see 4.3.2(c) and 4.3.2.3).
(s)
Vibration test if required (see 4.3.3(d) and 4.3.3.4).
(t)
Shock test requirements (see 4.3.3.2) (see 6.1 of MIL-S-901).
(u)
Preservation, packaging, packing, marking and shipment requirements (see 5.1).
(v)
(w)
Identification of procuring agency and design review agency (see 6.4).
Ship type and fluid system in which units are to be installed.
(x)
Designation of manufacturer (pump or driver) responsible to the purchaser
(y)
.
for compatibility of pump and driver and operation of the assembled unit.
6.1.1 The procurement document should specify if approval is required for the following: .
(a) Design drawings (see 3.9.1.2).
(b) Preliminary manuals (see 3.1O.1).
6.2 Management control system documents.
The following management control system
(a) MIL-P-15137 (see 3.8.1, 3.8.2, 3.8.4, 3.9.1.3 and 4.1.3.4(b)(6)).
(b) MIL-I-45208 (see 4.1.2).
6.3 The followings table of pump materials shall be used by the manufacturer in
selecting component part materials.
Table III - Pump materials.