| MIL-P-71012A(AR)
The part numbers on this list must represent the identical
pistol
components provided under the applicable pistol contract so that
repair parts ordered against these part numbers will be exactly
representative of the contractual pistol components in all areas,
icluding dimensions, protective finishes (see 3.3.14.2), etc.
4.
QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection. unless otherwise
specified in the contract or purchase order, the supplier is
responsible for the performance of all inspection requirements
(examinations and test) as specified herein. Except as otherwise
specified in the contract or purchase order, the supplier may use
his own or any other facilities suitable for the performance of
the inspection requirements specified herein, unless disapproved
by the Government. The Government reserves the right to perform
any of the inspections set forth in the specification where such
inspections are deemed necesssary to ensure supplies and services
conform to prescribed requirements.
4.1.1 Responsibility for compliance. All items shall meet
all requirements of sections 3 and 5. The inspection set sforth in
this specification shall become a part of the contractor overall
inspection system or quality program. The absence of any
inspection requirements in the specification shall not relieve, the
contractor of the responsibility of ensuring that all products or
supplies submitted to the Government for acceptance comply with
all retirements of the contract. Sampling inspection, as part of
manufacturing operations, is an acceptable practice to ascertain
conformance to requirements, however, this does not authorize
submission of known defective material, either indicated or
actual, nor does it commit the Government to accept defective
material.
4.2 Quality assurance terms and definitions. Quality
assurance terms and definitions used herein are in accordance with
MIL-STD-109.
4.3 Classification of inspection. The inspection
requirements specified herein are classified as below. The
provisions of MIL-W-63150 shall apply. Packages opened for
examination shall be repackaged by the contractor at the
contractors expense.
a.
First article inspection (see 4.4)
b.
Quality conformance inspection (see 4.5)
4.4 First article. The first article shall be selected from
pistols produced prior to the beginning of contractual quantity
production and submitted for testing in accordance with the
contract requirements (see 6.2). The first article shall be
representative of production processes to be used during
contractual quantity production. The first article shall be
13
|