|
| MIL-P-71012A(AR)
through failure analysis to determine the cause of failure and
shall effect the necessary corrective action on all pistols of the
lot and, as necessary, parts/subassemblies in-process. Following
these actions, and if authorized by the procuring agency, the
reconditioned lot may be resubmitted for the reliability test.
Sample size and test methods for reconditioned lots shall be the
same asfor new lots.
4.5.3.5 Component parts and repair parts testing. Raw
material testing, part testing, and" certification shall be
performed in accordance with the criteria specified in the
contract (see 6.2). This will include chemical analysis and
physical tests materials, and tests of protective finish, heat
tratment, bonding, and function of parts as applicable. The
contractor shall accomplish these tests prior to assembly of parts
into the end item.
4.5.3.6 Packaging
testing.
4.5.3.6.1
Pistols.
4.5.3.6.1.1 Certification. The contractor shall furnish the
Government representative with certification that the packaging
materials conform to the applicable packaging instructing in 5.0
and 6.2.
4.5.3.6.1.2 Determination of cleanliness testing. The
contractor shall test items from each inspection lot for
determination of cleanliness using the test method specified in
4.6.17.1. Sampling shall be in accordance with MIL -P-116
4.5.3.6.1
Seam strength testinq. The contractor shall test
package from each inspection lot for seam strength in 1
level A unit
accordance
with the requirements of MIL-P-116 and 4.6.17.2.
sampling
shall
be
in
accordance
with
MIL-P-116
4.5.3.6.2 Repair parts Testing of packaging of repair parts
shall be performed in accordance with MIL-P-116 OR AS specified in
the contract (see 6.2)
4.5.3.7 Test ammunition. Unless otherwise specified,
Government furnished M882 9MM Ball ammunition shall be used in
first article and acceptance test firing.
4.5.3.8 Alternative quality conformance provisions. Unless
otherwise specified herein or provided for in the contract,
alternative quality conformance procedures, methods, or equipment
such es statistical process control, tool control, other types of
sampling procedures, may be used by the contractor when they
provide, as a minimum, the level of quality assurance required by
the provisions specified herein. Prior to applying such
alternative procedures, methods, or equipment, the contractor
shall describe them in a written proposal submitted to the
Government for evaluation (see 6.7). When required, the
20
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |