|
| MIL-P-71012A(AR)
Acquisition
documents
should
6.2 Acquisition
requirements.
specify the following:
Title, number, and date of the specification.
a.
b.
Issue of DODISS to be cited in the solicitation, and
if required, the specific issue of individual
documents referenced (see 2.2).
c.
First article submission requirements (see 3.1)0
d.
Requirements for submission of operator's manuals (see
3.7.1 and 6.6).
e.
Requirements for submission of drawings (see 3.7.2 and
6.7).
f.
Requirements for submission of a parts list (see 3.7.3
and 6.7).
Pistol serial numbers assignment (see 3.5).
g.
h.
Disposition of interchangeability, reliability, and
safety tested pistols.
i.
Levels of preservation and packing. (see 5.1 and 5.2).
Examination and testing criteria for repair parts {see
j.
4.5.2.3.2, 4.5.3.5, 4.5.3.6.2 and 5.1.1.4.4).
k.
Place of final inspection and acceptance.
Responsibility for furnishing ammunition and
l.
associated certification.
m.
Procedures and methods for demilitarizing and
disposing of rejected material.
n.
Disposition of Government furnished property.
6.3 Test firing facilities. Test firing facilities and
operatinq Procedures shall be designed bY the contractor in
-
conformance with local, state, and Federal regulations and shall
be suitable for carrying out prescribed firing tests with safety
of operating and visiting personnel. Copies of the contractor
designs shall be provided to the contracting officer. Government
facilities may be viewed upon application to the contracting
officer.
6.4 Ammunition for test firing. To,avoid delay in test
firing, the contractor should maintain a minimum of two month's
supply of ammunition as determined by anticipated firing
requirements.
29
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |