|
| MIL-R-13577C
(Copies of specifications, standards, drawings and publications required
by suppliers In connection with specific procurement functions should be
obtained from the procuring activity or as directed by the contracting
officer.)
3. REQUIREMENTS
3.1 First article. Requirements for submission of first article
shall be as specified in the contract (see 6.2). Unless otherwise speci
fied (see 6.2), the first article shall include the pilot pack (see 5.1).
3.2 Materials, construction and design, Rods shall conform to the
materials$ construction and design requirements specified on the applica-
ble drawings (see 6.2) and MIL-w.13855.
3.2.1 Assembly. Cleaning rods shall be capable of assembly and
disassembly byhand$ without the use of tools.
3.2.2 Function. When applicable, swivel joints shall function with
out binding.
3.3 Marking. Marking shall be in accordance with the MIL-W-13855.
3 .4 Workmanship.
workmanship
Shall be
in accordance with
MIL-W-13855.
4. QUALITY ASSURANCE PROVISIONS
4.1 Resonsibility for inspection. Unless otherwise specified in
the contract or purchase order, the supplier Is responsible for the per-
formance of all inspection requirements as specified herein. Except as
otherwise specified In the contract or order, the supplier may use his
own or any other facilities suitable for the performance of the Inspection
requirements specified herein, unless disapproved by the Government. The
Government reserves the right to perform any of the inspections set forth
in the specification where such inspections are deemed necessary to assure
supplies and servi ces conform to prescribed requirements.
4.2 Quality assurance terms and definitions Quality assurance
terms and definitions used herein are in accordance with MIL-STD-109.
2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |