|
| MIL-P-45694(Ord)
(Copies of specifications, standards, drawings and publications
required by contractors in connection with specific procurement
functions should be obtained from the procuring activity or as
directed by the contracting officer.)
3.
REQUIREMENTS
3.1 Production model.- At the beginning of production one
plotting board, representative of productions shall be made
available to the Government to determine if the board meets all
the requirements of this specification.
3.2 Materials.- The materials shall be in accordance with
the drawings, material specifications, and general specifications
forming a part of this specification
3.3 Construction.- The plotting board shall be manufactured
in accordance with Drawing F7689472 "Plotting Board: M17", and all
drawings pertaining thereto. The requirements of this specification
are detailed only to the extent considered necessary to insure the
inherent quality and the performance capabilities of the product
"prior to final acceptance by the Government.
3.4 General specification.-
The contractor shall be
responsible for adherence to and compliance with the following
requirements of Specification MIL-F-13926:
a Order of precedence
b Protective finished surfaces
c Special accuracy
d Workmanship
3.5
Environmental.
Temperature.- The plotting board shall meet
3.5.1 Operating
the requirements of 3.6 through 3.9 thermally stabilized at
ambient temperatures of minus 40 degrees and plus 125 degrees
Fahrenheit.
3.5.2. Storage temperature.- The plotting board shall show
no evidence of damage or defects; and the plotting board shall
meet the requirements of 3.6 through 3.9 at room ambient temperature
(plus 60 to 90 degrees Fahrenheit) after having been thermally
stabilized at ambient temperatures of minus 60 degrees and plus
140 degrees Fahrenheit,
2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |