|
| MIL-P-46610E(MU)
6.2 Action time is the total elapsed time from the application of energy
to the primer until the emergence of the bullet from the barrel and passage
through the terminal pickup.
6.3 Skewness value.-The method for computation of the skewness value is
shown on Figure 1.
6.4 Hazard notice.-The primers described herein and certain
of their components are flammable and/or explosive and consequently present
hazards in manufacture, handling, storage and shipment. The contractor
should recognize these hazards and take appropriate measures to guard and
protect against fire, explosion, adverse environment, corrosive atmosphere,
rough handling and electrically induced incidents.
Preparing Activity:
Custodian:
Army - MU
Army - MU
Project NO. 1305-A746
20
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |