Click here to make tpub.com your Home Page

Page Title: Table IV
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-P-4845lA(MU)
TABLE IV
TEST PROCEDURE
REQUIREMENT
CHARACTERISTIC
No.
4.6.1.1
3.4.1
304. Storage temperature
(-80 and +160F)
4.6.1.2
3.4.2
305. Operating temperatures
o
(-40 and +150 F)
4.6.1.2, 4.6.2.1
306. Operability, elevation input shaft
3.4.2, 3.5.1
4.6.1.2, 4.6.2.2
3.4.2, 3.5.2
307. Operability, diopter movement -
Daylight and Passive
4.6.1.2, 4.6.2.3
308. Operability, focusing mechanism -
3.4.2, 3.5.3
Passive
4.6.1.2, 4.6.2.4
309. Operability, disengagement of bore-3.4.2,
3.3.4
sight knob locks - Daylight
and Passive
4.6.1.2, 4.6.2.5
310 l Operability, rotation of boresight 3.4.2,
3.5.5
knob - Daylight and Passive-
4.6.1.2, 4.6.2.6
3.4.2,
3.5.6
311 l Operability, shutter lever and
on-off  switch l Passive
4.6.1.2, 4.6.2.7
312. Operability, gain adjust and re- 3.4.2,
3.5.7
ticle brightness control - Passive
NOTE:
The tests for characteristics 306 through 312 inclusive, shall be
conducted at -40 and +150F.
4.4.4 Failure of sample.- Should any one Item of a special sampling
fail to meet the specified test requirements, acceptance of the represented
inspection lot shall be suspended by the Government until necessary correc-
tions have been made by the contractor and resubmitted samples have been
approved (see 4.3.3).
4.5 Inspection equipment.- Except as otherwise provided for by the
contract, the contractor shall supply and maintain inspection equipment
in accordance with the applicable requirements of MIL-I-45607.
4.5.1 Government furnished inspection equipment.- Where the con-
tract provides for Government furnished test equipment, supply and maint-
enance of test equipment shall be in accordance with the applicable re-
quirements specified in MIL-I-45607.
4.5.2 Contractor furnished inspection equipment.
4.5.2.1  Goverment design.- Unless otherwise specified in the con-
tract, all inspection equipment specified by drawing number in specifica-
tions or SQAP forming a part of the contract shall be supplied by the con-
tactor in accordance with technical data listed in the technical data
package (TDP).
11

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business