6.3.3 Submission of designs for approval. -Contractor designs
shall be approved by the Government prior to fabricating or
procuring the equipment. Partial submission of inspection equipment
designs is permissible and encouraged. However, the completion date
for design review will be based on the date of the final submission
submission of designs and the required delivery schedule as
stipulated in the contract. Submit designs as required to:
Commander, US Army Armament Research and Development Command, ATTN:
DRDAR-QAF-1, Dover, NJ 07801.
When the contractor submits inspection equipment designs to the
Government for approval, he shall give the following information in
his letter of transmittal:
The contract number
a.
The contract item (name, model number, etc.)
b.
The designs remaining to be submitted and the expected date
c.
of submittal
6.4 Drawings. -Drawings listed in Section 2 of this speci-
fication under the heading US Army Armament research and Development
Command (ARRADCOM) may also include drawings prepared by, and
identified as Edgewood Arsenal, Frankford Arsenal, Rock Island
Arsenal or Picatinny Arsenal drawings. Technical data originally
prepared by these activities is now under the cognizance of ARRADCOM.
6.5 Input Coupling. -At no time shall the input coupling be
allowed to strike hard against the travel stops.