| MIL-P-64036(AR)
selected at random and sectioned to determine compliance with
3.7.1. Failure of any specimen to comply shall be cause for
rejection of the lot. See 4.4.5.5.
4.4.3.4 Salt spray test. The specimens submitted for testing
in accordance with Table I and 4.4.2.4 shall be tested in accordance
with the requirements of dwg. 10534894 and 4.4.5.6 herein.
Twenty sample projectiles shall be
4.4.3.5 Proving ground.
selected for this test. The test shall be performed as specified in
4.4.5.7. Defect classification and individual accept/reject
criteria shall be in accordance with the following table:
TABLE II Proving ground test
Accept/Reject
Defect
Categories
Premature burst, metal part break-
Critical:
0
1
up, or deformation due to launch
Horizontal range less than 80% of
Major
1
2
average range
4.4.4 Inspection equipment. The inspection equipment required
to perform the examinations and tests prescribed herein is described
in the "Paragraph Reference/Inspection Method" column in the tables
starting with paragraph 4.4.2.1. The contractor shall submit for
approval inspection equipment designs in accordance with the terms
of the contract. See Section 6 of MIL-A-48078 and 6.4 herein.
4.4.5 Methods of inspection.
4.4.5.1 Materials, components and processes. Compliance with
all requirements of Section 3 of the specification shall be
ascertained by current and continuing examination of inspection and
test data to determine that all components (parts, subassemblies,
and materials) have been inspected and tested and found to comply
with their respective drawing, specification or specification
requirements, and that all specified manufacturing processes have
been followed.
The visual, manual
4.4.5.2 Visual and mechanical inspections.
and mechanical inspections and tests shall verify compliance with
the requirements of Section 3, 4, and 5 of the specification in
accordance with 4.4.2 herein.