|
| MIL-P-70550 (AR)
material produced since the last successful test. If the test is
disturbed as indicated by a sharp change in the slope, the test
may be repeated with another specimen representing material
produced at the same time interval. Pellets must be fully cured
prior to testing therefore identity of the pellets is required
until the test is satisfied.
5.
PACKAGING
5.1 Packaging, packing and marking. Packaging of pellets
for shipping shall be in accordance with 49 CFR 100-199. Marking
shall be in accordance with MIL-STD-1169.
NOTES
6.
6.1 Alternate procedures to those contained in this
specification shall be approved in advance by: Commander, USA
ARDEC, ATTN: AMSMC-QAT-B (D), Dover, NJ 07801-5001.
6.2 Ordering data.
See MIL-A-48078.
Drawings listed in Section 2 of this
6.3 Drawings.
specification under the headings U.S. Army Armament Research,
Development and Engineering Center (ARDEC) may also include
drawings prepared by, and identified as Edgewood Arsenal,
Frankford Arsenal, Rock Island Arsenal or Picatinny Arsenal and
U.S. Armament Research and Development Command (ARRADCOM)
drawings. Technical data originally prepared by these activities
is now under the cognizance of ARDEC.
6.4 Submission of inspection equipment for design approvals.
See MIL-A-48078. Submit desings as required to Commander, U.S.
Army Armament Research, Development and Engineering Center,
(ARDEC) ATTN: AMSMC-QAT-I (D) , Dover, NJ 07801-5001.
6.5 Material safety data sheets. The contracting officer
will identify those activities requiring copies of completed
Material Safety Data Sheets prepared in accordance with
FED-STD-313. The pertinent government mailing addresses for
submission of data are listed in appendix B of FED-STD-313.
9
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |