|
| MIL-P-82442(OS)
IDENTIFICATION
PART
Pin, Groove
MS- 35675-10
AN- 932-S2, S3
Plug, Csk Hex Hd Pipe
NAS- 617-4
Packing, Preformed
5.
PREPARATION FOR DELIVERY
5.1
Preservation and packaging.
Preservation and packaging shall
be level A or C as specified. See 6.2.
Unit package shall consist of one
pump. l
5.1.1
Level A. Preservation and packaging of equipment for
level A shipment shall be in accordance with MIL-P-116. Cleaning shall
be accomplished in accordance with Process C-1 and drying, if required,
shall be accomplished with Method D-1, or D-4. Preservation and pack-
aging shall be Method IA.
5.1.2
Level B.
Not applicable.
5.1.3
--evel C. Cleaning, drying, preservation and packaging shall
L
.
be accomplished in accordance with the supplier's own commercial practice
when such practices have been approved by the procuring activity.
Packing. Packing shall be level A or C as specified.
5.2
See
6.2.
Shipping container shall contain one unit package.
Level A. The equipment, when preserved and packaged in
5.2.1
accordance with 5.1.1, shall be overpacked in containers complying with
MIL-P-116, Method 11 D.
5.2.2
Level B.
Not applicable.
--
Level C. The equipment, when preserved and packaged in accord-
5.2.3
ante with 5.1.3, shall be overpacked in compliance with Uniform Freight
Classification Rules or other common carrier regulations applicable to
the mode of transportation.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |