| ![]() MIL-P-82530(OS)
Table I. Preproduction and Periodic Production Test Sequence
* Units are expended during functioning.
* * Units are subjected to only one environmental test.
Test only units that have been subjected to environmental tests,
4.3.3 Periodic production sample. From designated lots (See 6. 2f) of ten
t h o u s a n d (10, 000) or less, a random sample of fifty (50) primers shall be selected,
These sample units shall be subjected to the tests of 4.5. The primers shall be
considered satisfactory if they meet all specification and pertinent draw ing re-
quirements and withstand the tests specified in 4.5. (See Table I.) When a lot
is judged defective, acceptance of all units in the lot shall be withheld and the
contractor shall:
a. Determine the cause of the defect.
|