Click here to make tpub.com your Home Page

Page Title: Test Conditions
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-R-23016(Wep)
4.5.1
Test Conditions:
The life test shall be conducted under the following
simulated service conditions.
Temperature
Normal room
Altitude
Normal ground (0 - 5000 ft.)
Humidity
Room ambient
A. C. Voltage
115 5 volts (at lowest applicable
frequency)
D. C. Voltage
27.0 2.0 volts
4.5.2
Test Periods:
The test may be run continuously or intermittently. Any
period of operation shall be of sufficient duration to permit
the equipment temperature to stabilize. Periodically, the
equipment shall be turned on and off several times and put
through its various phases of operation.
4.5.3
Performance Check:
At approximately 8-hour intervals during the test, a limited
performance check shall be made. The performance check
proposed by the contractor shall be subject to approval by
the procuring activity.
4.5.4
Test Data:
The contractor shall keep a daily record of the performance
of the equipment, making particular note of any deficiencies
or failures.  In the event of part failures, the defective
part shall be replaced and the operation resumed for the
balance of the test period. A record shall be kept of all
failures throughout the test, including all tube failures.
This record shall indicate the following.
(1) Part type number
(2) The circuit reference symbol number
128

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business